Connecting the storage system to the network
Scenario 1 Directly connecting front-end ports to the application server
Network cable connection
19
Application server
Controller enclosure
Application server
Controller enclosure
Optical fiber cable connection
A controller enclosure can be connected to application servers using front-end ports (8 Gbit/s, or 16 Gbit/s
Fibre Channel, 10GE, 10 Gbit/s FCoE, GE electrical, 10GE electrical, or 56 Gbit/s InfiniBand).
10GE electrical interface modules support GE/10GE auto-sensing.
The following figures are an example of cable connections. The details like cable appearance and types of
interface modules may be different from those at your site.
The following figures show the connections by network cables and optical fibers. For details, see OceanStor
2000, 5000, and 6000 V3 Series V300R006 Installation Guide.