3 Connecting Clock Cables and Cables in the Interface Area
6800 subrack
Interface area
Board area
`
Clock cables must be made on site. The clock cables
are shielded network cables with shielded RJ-45
connectors but without protective tubes.
You need to route clock cables along each column in
the cabinet and install white cable clamps delivered
in the accessory package to fix the clock cables.
Clock cable
Select a or b according to the actual situations.
CAUTION
NOTE
M3
2# screwdriver
0.39 ± 0.04 N.M