EasyManua.ls Logo

Huawei OptiX OSN 8800 T16 - Page 34

Huawei OptiX OSN 8800 T16
139 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
31
8 Installing DCM Frames
Attach the mounting ears to the left and right columns with four screws, two screws on each side.
Ground
point
1-BF1L
1: cabinet 1, B: back, F1: layer 1, L: left
DCM-1-BF1L
DCM-1-BF2L DCM-1-BF2R
DCM-1-BF1R
Front of a cabinet
DCM-1-F1L
DCM-1-F2L DCM-1-F2R
DCM-1-F1R
Engineering design slot layout
Back of a cabinet
DCM
DCM
Subrack
Installation positions of DCM frames
Determine the position of the DCM based on the engineering design slot layout. The following figure shows an
example of the slot layout.
NOTE
2.04 ± 0.20 N.M
M6
2# screwdriver
4.90 ± 0.49 N.M
M6
3# screwdriver

Related product manuals