EasyManua.ls Logo

Huawei OptiX RTN 910A - Page 12

Huawei OptiX RTN 910A
44 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
10
Installation Scenarios of the Cabinets
1
Installation Scenarios of the APM30H or TMC11H Cabinet
Requirements for the Installation Dimensions and Space of the Cabinet
(Unit: mm)
a
Installation Scenarios
b
600
600
600
480
> 800
> 300
> 60
> 300
40 40
Maximum
120°
Cabinet Cabinet Cabinet
The data shown in the figure is not for the concrete pad.
The recommended distance between the cabinets is 40 mm and the maximum distance between the cabinets is 150 mm.
If the noise reduction module (NRM) is required, the distance between the cabinets is 150 mm.
Installing the APM30H cabinet on the base
APM30H
IBBS200D/T
battery
cabinet
IBBS200D/T
Base
The installation scenarios of the TMC11H cabinet are the same
as those of the APM30H cabinet.
Installing the APM30H cabinet in a stacked manner
NOTE
NOTE

Related product manuals