Table 3-1 Engineering Responsibilities
Optical
Cable
Provider
Engineering
Party
Recommended
Solution
Remarks
Huawei Huawei Solution 1 is
preferred. If
solution 1 fails to
implement,
Huawei is required
to communicate
with the customer
about engineering
risks and sign a
memorandum with
the customer
before using
solution 2.
If solution 1 is used,
the engineering quality
must strictly comply
with engineering
specications. If
solution 2 is used, the
network box must be
securely grounded. In
addition, a metal
protective cover must
be installed between
the
ber strength
member and network
box
xing points,
preventing sparks from
spreading if the ber
strength member
connects to a heavy-
current power line.
Customer Solution 1 If the engineering does
not comply with
solution 1, the
customer must take
consequences.
Customer Huawei Requirements:
During
engineering, do
not route the ber
strength member
into the network
box. In addition,
ground the
ber
strength member
and the network
box separately.
Install the network
box and ONU
based on the
instructions
provided in this
document.
The customer must
ensure that the ber
strength member is not
be routed inside the
network box.
Otherwise, the
customer must take
consequences.
a. Grounding solution 1: The
ber strength member is isolated from the
network box and grounded outside the network box.
OptiXstar B650G-8E8P3W
Quick Start 01 3 Installing the Device
Issue 01 (2022-04-07) Copyright © Huawei Technologies Co., Ltd. 11