Table 3-1 Engineering Responsibilities
Optical
Cable
Provider
Engineering
Party
Recommended
Solution
Remarks
Huawei Huawei Solution 1 is
preferred. If
solution 1 fails to
implement,
Huawei is required
to communicate
with the customer
about engineering
risks and sign a
memorandum with
the customer
before using
solution 2.
If solution 1 is used,
the engineering quality
must strictly comply
with engineering
specications. If
solution 2 is used, the
network box must be
securely grounded. In
addition, a metal
protective cover must
be installed between
the
ber strength
member and network
box
xing points,
preventing sparks from
spreading if the ber
strength member
connects to a heavy-
current power line.
Customer Solution 1 If the engineering does
not comply with
solution 1, the
customer must take
consequences.
Customer Huawei Requirements:
During
engineering, do
not route the ber
strength member
into the network
box. In addition,
ground the
ber
strength member
and the network
box separately.
Install the network
box and ONU
based on the
instructions
provided in this
document.
The customer must
ensure that the ber
strength member is not
be routed inside the
network box.
Otherwise, the
customer must take
consequences.
a. Grounding solution 1: The
ber strength member is isolated from the
network box and grounded outside the network box.