EasyManua.ls Logo

Huawei RRU5309w User Manual

Huawei RRU5309w
125 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
Page #1 background imageLoading...
Page #1 background image
RRU5909&RRU5309&RRU5309w&RR
U3959a Installation Guide
Contents
7.2.2 RRU5909&RRU5309&RRU5309w&RRU3959a Installation Guide
7.2.2.1 Changes in RRU5909&RRU5309&RRU5309w&RRU3959a Installation Guide
7.2.2.2 Installation Preparations
7.2.2.2.1 Reference Documents
7.2.2.2.2 Tools and Instruments
7.2.2.2.3 Skills and Requirements for Onsite Personnel
7.2.2.3 Information About the Installation
7.2.2.3.1 RRU Exterior
7.2.2.3.2 RRU Ports
7.2.2.3.3 RRU Indicators
7.2.2.3.4 Installation Scenarios
7.2.2.3.5 Installation Clearance Requirements of an RRU
7.2.2.3.5.1 Clearance for a Single RRU
7.2.2.3.5.2 Clearance for Three or More RRUs
7.2.2.3.5.3 Installation Spacing Between RRUs
7.2.2.4 Unpacking the Equipment
7.2.2.5 Installation Process
7.2.2.6 Hoisting an RRU and Related Cables onto a Tower
7.2.2.6.1 Hoisting an RRU onto a Tower
7.2.2.6.2 Hoisting Optical Fibers onto a Tower
7.2.2.6.3 Hoisting Power Cables onto a Tower
7.2.2.7 Installing the RRU
7.2.2.7.1 Mounting Kits for an RRU
7.2.2.7.2 Installing the RRU on a Pole
7.2.2.7.2.1 Installing a Single RRU
7.2.2.7.2.2 Installing Two RRUs
7.2.2.7.2.3 Installing Three or More RRUs
7.2.2.7.3 Installing an RRU on U-steel
7.2.2.7.4 Installing an RRU on Angle Steel
7.2.2.7.5 Installing an RRU on a Wall
7.2.2.7.6 Installing an RRU on an IFS06
7.2.2.8 Installing RRU Cables
7.2.2.8.1 Cabling Requirements
7.2.2.8.2 RRU Cable Connections
7.2.2.8.3 Installing RRU Cables
7.2.2.8.4 RRU Cable List
7.2.2.8.5 Installing an RRU PGND Cable
7.2.2.8.6 Installing an RRU RF Jumper
7.2.2.8.7 Installing an RRU AISG Multi-Wire Cable and AISG Extension Cable
7.2.2.8.8 Opening the Cover Plate of an RRU Cabling Cavity

Table of Contents

Question and Answer IconNeed help?

Do you have a question about the Huawei RRU5309w and is the answer not in the manual?

Huawei RRU5309w Specifications

General IconGeneral
BrandHuawei
ModelRRU5309w
CategoryConference System
LanguageEnglish

Summary

Installation Preparations

Skills and Requirements for Onsite Personnel

Outlines qualifications and training for installation personnel.

Information About the Installation

Installation Process

Hoisting an RRU and Related Cables onto a Tower

Hoisting an RRU onto a Tower

Details procedures and precautions for hoisting RRUs onto towers.

Installing the RRU

Installing the RRU on a Pole

Covers procedures for installing RRUs on poles.

Installing an RRU on U-steel

Details installing RRUs on U-steel supports.

Installing an RRU on Angle Steel

Explains procedures for installing RRUs on angle steel.

Installing an RRU on a Wall

Covers procedures for installing RRUs on walls.

Installing an RRU on an IFS06

Outlines procedures for installing RRUs on IFS06.

Installing RRU Cables

Cabling Requirements

Specifies requirements for routing and binding cables to prevent interference.

Checking the RRU Hardware Installation

Powering On an RRU

Related product manuals