EasyManua.ls Logo

Huawei RRU5309 User Manual

Huawei RRU5309
125 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
Page #1 background imageLoading...
Page #1 background image
RRU5909&RRU5309&RRU5309w&RR
U3959a Installation Guide
Contents
7.2.2 RRU5909&RRU5309&RRU5309w&RRU3959a Installation Guide
7.2.2.1 Changes in RRU5909&RRU5309&RRU5309w&RRU3959a Installation Guide
7.2.2.2 Installation Preparations
7.2.2.2.1 Reference Documents
7.2.2.2.2 Tools and Instruments
7.2.2.2.3 Skills and Requirements for Onsite Personnel
7.2.2.3 Information About the Installation
7.2.2.3.1 RRU Exterior
7.2.2.3.2 RRU Ports
7.2.2.3.3 RRU Indicators
7.2.2.3.4 Installation Scenarios
7.2.2.3.5 Installation Clearance Requirements of an RRU
7.2.2.3.5.1 Clearance for a Single RRU
7.2.2.3.5.2 Clearance for Three or More RRUs
7.2.2.3.5.3 Installation Spacing Between RRUs
7.2.2.4 Unpacking the Equipment
7.2.2.5 Installation Process
7.2.2.6 Hoisting an RRU and Related Cables onto a Tower
7.2.2.6.1 Hoisting an RRU onto a Tower
7.2.2.6.2 Hoisting Optical Fibers onto a Tower
7.2.2.6.3 Hoisting Power Cables onto a Tower
7.2.2.7 Installing the RRU
7.2.2.7.1 Mounting Kits for an RRU
7.2.2.7.2 Installing the RRU on a Pole
7.2.2.7.2.1 Installing a Single RRU
7.2.2.7.2.2 Installing Two RRUs
7.2.2.7.2.3 Installing Three or More RRUs
7.2.2.7.3 Installing an RRU on U-steel
7.2.2.7.4 Installing an RRU on Angle Steel
7.2.2.7.5 Installing an RRU on a Wall
7.2.2.7.6 Installing an RRU on an IFS06
7.2.2.8 Installing RRU Cables
7.2.2.8.1 Cabling Requirements
7.2.2.8.2 RRU Cable Connections
7.2.2.8.3 Installing RRU Cables
7.2.2.8.4 RRU Cable List
7.2.2.8.5 Installing an RRU PGND Cable
7.2.2.8.6 Installing an RRU RF Jumper
7.2.2.8.7 Installing an RRU AISG Multi-Wire Cable and AISG Extension Cable
7.2.2.8.8 Opening the Cover Plate of an RRU Cabling Cavity

Table of Contents

Question and Answer IconNeed help?

Do you have a question about the Huawei RRU5309 and is the answer not in the manual?

Huawei RRU5309 Specifications

General IconGeneral
BrandHuawei
ModelRRU5309
CategoryConference System
LanguageEnglish

Summary

RRU5909&RRU5309&RRU5309w&RRU3959a Installation Guide

Changes in RRU5909&RRU5309&RRU5309w&RRU3959a Installation Guide

Details changes and updates across document revisions for accuracy and new features.

Installation Preparations

Outlines necessary reference documents, tools, instruments, and required skills for installation.

Information About the Installation

Covers RRU exterior, ports, indicators, installation scenarios, and clearance requirements.

Unpacking the Equipment

Guides on how to unpack, inspect, and verify the delivered RRU equipment.

Installation Process

Provides a visual flowchart of the overall RRU installation steps.

Hoisting an RRU and Related Cables onto a Tower

Details procedures and precautions for lifting RRUs and associated cables onto a tower.

Installing the RRU

Covers the step-by-step procedures for mounting the RRU unit in various configurations.

Installing RRU Cables

Covers the procedures for installing various types of RRU cables, including requirements and connections.

Checking the RRU Hardware Installation

Provides a checklist to verify the correctness and security of RRU hardware installation.

Powering On an RRU

Describes the process and essential checks for powering on the RRU after installation.

Appendix

Contains supplementary information, including detailed procedures for specific components like connectors.

Related product manuals