EasyManua.ls Logo

Huawei SmartLogger 3000 - Page 9

Huawei SmartLogger 3000
52 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Cause ID=5:
1. Check whether the communication network between the SmartLogger and
the plant scheduling control system is normal.
2. Check whether the active power scheduling commands received by the
SmartLogger from the plant scheduling control system are correct, such as
the command format and protocol type.
3. When "Active power control mode" is set to "Remote dispatch" and the "Shut
down array upon communication timeout" function is not needed, you are
advised to disable the function.
SmartLogger3000
Alarm Reference
2 1100 Active Power Scheduling Instruction
Exception
Issue 01 (2023-09-15) Copyright © Huawei Technologies Co., Ltd. 3

Table of Contents

Related product manuals