EasyManua.ls Logo

Huawei SUN2000-100KTL-M0 - Page 37

Huawei SUN2000-100KTL-M0
149 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Figure 4-4 Installation dimensions
NO TE
For ease of installing the solar inverter on the mounting bracket, connecting cables to the
bottom of the solar inverter, and maintaining the solar inverter in future, it is recommended
that the bottom clearance be between 600 mm and 730 mm. If you have any question
about the clearance, consult the local technical support engineers.
When installing multiple solar inverters, install them in horizontal mode if
sucient space is available and install them in triangle mode if no sucient space
is available. Stacked installation is not recommended.
Figure 4-5 Horizontal installation mode (recommended)
SUN2000-(100KTL, 110KTL, 125KTL) Series
User Manual 4 Installation
Issue 07 (2020-09-15) Copyright © Huawei Technologies Co., Ltd. 29

Table of Contents

Related product manuals