2.4.1 Product Appearance
Appearance
Figure 2-6 Appearance
(1) Panel (2) LED indicators
(3) Maintenance compartment door (4) Mounting bracket
(5) External fan tray (6) DC input terminal group 1 (PV1–PV8,
controlled by DC SWITCH 1)
(7) Screw hole for the DC switch 1 (8) DC switch 1 (DC SWITCH 1)
(9) DC input terminal group 2 (PV9–PV14,
controlled by DC SWITCH 2)
(10) Screw hole for the DC switch 2
(11) DC switch 2 (DC SWITCH 2) (12) DC input terminal group 3 (PV15–PV20,
controlled by DC SWITCH 3)
(13) Screw hole for the DC switch 3 (14) DC switch 3 (DC SWITCH 3)
(17) Communications port (COM) (18) Hole for the AC output power cable
(19) Hole for the tracking system power cable -
According to Australian standards, the screws for DC switches are delivered with SUN2000s.
The screws are used to secure DC switches (DC SWITCH 1, DC SWITCH 2, and DC SWITCH
3) to prevent them from being turned on by mistake.
SUN2000-(100KTL, 110KTL, 125KTL) Series
User Manual 2 Overview
Issue 07 (2020-09-15) Copyright © Huawei Technologies Co., Ltd. 13