EasyManua.ls Logo

Huawei SUN2000-2KTL-L0 - Page 70

Huawei SUN2000-2KTL-L0
86 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
SUN2000-(2KTL-5KTL)-L0
User Manual
6 System Commissioning
Copyright © Huawei Technologies Co., Ltd.
64
6.4 Grid-tied Point Control
Procedure
Step 1 On the Home screen, choose Device maintenance > Energy control > Grid-tied point
control and perform the required operation.
Figure 6-8 Grid-tied point control
Table 6-3 Description of control mode parameters
Parameter
Description
Value Range
Control mode
If this parameter is set to
Not restricted, the
SUN2000L output power is
not limited. The SUN2000L
can export its rated power to
the power grid.
If this parameter is set to
Grid connected with zero
power and the SUN2000L
is connected to a power
meter, the output power of
the SUN2000L is supplied
only to the local load, but
not the power grid.
If this parameter is set to
Power-limited Grid
Connected and the
SUN2000L is connected to a
power meter, the
SUN2000L supplies power
limited based on the setting
of Grid-tied Point Power
to the power grid.
Not restricted
Grid connected with zero
power
Power-limited Grid
Connected
----End

Related product manuals