3
1
Installing Devices
1. Determine the
installation dimensions.
UPS (3U)
Battery pack
(optional, 3U)
Rack-Mounted Installation
Scena
rio 1
Install devices from
bottom to top, as
shown in the figure.
2. Install mounting ears.
M4x8 (8 PCS)
1.2 N•m