EasyManua.ls Logo

Hunter ACC2 - Pump;Master Valve Setup

Hunter ACC2
26 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
14
ACC2 STRONGBOX PEDESTAL ASSEMBLY INSTRUCTIONS
Assembly
Reassembling the Hunter ACC2 inner
chassis assembly: Power supply assembly
(Decoder version shown)
Step 1: Reconnect the two cables from the
deck assembly (Fig. 1).
Step 2: Reconnect the cable from the
junction box assembly (Fig. 2).
Step 3: Reinstall the power supply assembly
being careful not to pinch any of the cables.
Power supply assembly should sit ush.
Tighten the captive screws (qty: 3) using #2
Phillips head screwdriver (Fig. 3).
Fig. 1 Fig. 2 Fig. 3