7
8
Installing the Pull Chains
Insert the third cage assembly screw, found
in the hardware bag, in place and rmly
tighten all the three screws.
Ceiling Bracket Downrod Hanging Fan Wiring Canopy Blades Bulbs Cage
Remove and discard the plastic connectors from the ends of the short pull chain.
Attach the pull chain pendants to the light and fan pull chains.
The fan pull chain controls
the speed: from high to off.
The light pull chain controls
the light xture: on and off.
Repeat x2
3 of 6
Light Kit Screw
bag
Connect the plug to the lower switch housing. Make sure to line up the colored markings on the connectors and that the connectors
latch. Attach the lower switch housing to the upper switch housing using three light kit screws found in the hardware bag.
Cage will need to be rotated in order to pass
over the sockets.
Note:
NOTE: Check to ensure
proper engagement.
2 of 3
1 of 3
bag
bag
Cage
Assembly
Screw
Cage
Assembly
Screw
Partially install two cage assembly screws, found
in the hardware bag, halfway into the light
kit as shown. It does not matter which screw
holes you choose.
Lift cage assembly into place while passing pull chains
through cage assembly as shown. Align the keyhole slots
in the top of the cage assembly with the partially installed
cage assembly screws. Wrap the keyhole slots around the
screws and twist counterclockwise.
FAN FALL HAZARD
Make sure all screws are tight to secure
the light xture.
GLASS FALL HAZARD
To prevent SERIOUS INJURY or DEATH, make
sure that glass is properly secured.