112479_0510 4-5
NOTES:
1. Torque initially and after first 2 hours of operation.
2. Refer to Electrical section of this manual for more detailed information.
3. Inspect ROPS after the first 20 hours of operation and then after every 100 hours of operation or yearly whichever comes first.
NOTE: After completing maintenance cycle (100 hours), repeat cycle.
Hustler
®
Zeon
Maintenance Schedule
Refer to Fig. 4-7
SERVICE AT
INTERVALS INDICATED
MONTHLY
OR 40 HOURS
ANNUALLY
OR 100
HOURS
Verify safety start interlock system Prior to each use
Visually inspect unit for loose
hardware and/or damaged parts
Prior to each use
Visually inspect tires Prior to each use
Blades - sharpen & securely
fastened
Prior to each use
Discharge chute - securely in place
& in lowest position
Prior to each use
Charge batteries After each use
Clean machine Daily
Grease gauge wheel bearings X
Check battery connections X
Check tire pressure with a gauge X
Grease deck height pivots X
Grease deck lift pedal pivot X
Tighten lug nuts on wheels (1) X
Check ROPS mounting hardware
(3)
X
Check battery water level (2) Every 30 charging cycles