INSTALLATION INSTRUCTIONS
INSTALLATION SPECIFICATIONS
TheAQUA-LABchemicaldeliverysystemhasbeendesignedforafastandhasslefreeinstallation.It
comesfullyassembledwithallofthecomponentspre-wiredandplumbed,leavingonlythesettingof
equipment,andconnectionoftheincomingandoutgoinghosesandwires.Asfollowsaretheinstallation
specicationsfortheAQUA-LAB:
GENERAL:
• PeopleRequired:2people
• MechanicalSkillLevel:Basic-Mountingequipment
• ElectricalSkillLevel:Advanced-Threephasepowerandknowledgeoflocalcodesisrequired
• PneumaticSkillLevel:Basic-pneumaticutilityconnectionrequired
• FluidSkillLevel:Basic-Waterutilityconnectionrequired
• ChemicalKnowledge:Advanced-Chemicaltitrationsrequired
TOOLS AND EQUIPMENT NEEDED:
• Unpacking:Normalhandtools
• Assembly:Normalhandtools
• Wiring:Normalelectricalwiringtools
• Startup:Electricalmeterhelpfulbutnotrequired
ESTIMATED TIMELINE:
• Unpacking:15–30minutes
• FrameMounting:0.5–2.0hours
• FluidConnections:0.5–2.0hours
• Motor&ValveWiring:1–4.0hours
• Startup&adjustment:1.5–6.0hours
UNPACKING
TheAQUA-LABisshippedinawoodencrateforthepurposeofprotection.Beforeunpacking,besure
thattheAQUA-LABisonalevel-atsurface.Tounpack,performthesesteps:
1. OpenthecrateusingadrillwithPhillipsbitorPhillipsheadscrewdriver
2. CutthecellophaneoffoftheAQUA-LABbyusingautilityknife.Besuretocuteitheratthe
cornersorinanareawheretheknifewillnotdamagetheAQUA-LAB.
3. Usinganadjustablewrench,un-bolttheAQUA-LABfromthepallet.
4. LifttheAQUA-LABfromthepallet.Useassistanceifnecessary.
5. Disposeofpallet,cellophaneandadditionalpackagingmaterials.