MR SERIES
INSTALLATION
MANUAL AND
REPLACEMENT
PARTS LIST
Modular Gas-Fired Cast
Iron Water Heating Plants
360,000 to 2,400,000
Btuh Input
Applicable For Larger Heating
Plants Using Boiler Banks Of
8-Modules Or Less
NOTE: If shop drawings have not been provided, refer to the Appendices at the rear of this manual for sizing
(breeching, chimney & gas piping) and control system data.
IN UNITED STATES: 260 NORTH ELM ST • WESTFIELD, MA 01085 • (413) 564-5515 • FAX (413) 568-9613
IN CANADA: 5211 CREEKBANK ROAD • MISSISSAUGA, ONT. L4W 1R3 • (905) 625-2991 • FAX (905) 625-6610
SECTION 1: INTRODUCTION
Heating Plant Design............................................2
Code Compliance.................................................2
Heating Plant Shipment........................................2
Heating Plant Dimensions....................................3
SECTION 2: INSTALLING MODULES
Step 1: Planning Ahead........................................4
Step 2: Arranging Heating Plant...........................5
Step 3: Setting & Aligning Modules......................5
SECTION 3: INSTALLING WATER PIPING
Step 1: Planning Ahead........................................6
Step 2: MC Heat Exchangers...............................6
Step 3: Supply & Return Headers........................6
Step 4: Hydronic Components..............................7
Step 5 Hydrotesting The Systems........................8
Combination Heat/Cool Systems........................10
SECTION 4: VENTING THE HEATING PLANT
Step 1: Planning Ahead......................................11
Step 2: Drafthoods & Vent Dampers...................12
Step 3: Vent Connectors & Slip Joints................13
Step 4: Breeching Runs.......................................14
SECTION 5: INSTALLING JACKETS
Jacket Assembly..................................................15
SECTION 6: INSTALLING GAS PIPING
Step 1: Gas Main & Gas Headers.......................16
Step 2: Test Gas Piping.......................................16
SECTION 7: WIRING THE HEATING PLANT
Module Wiring......................................................17
SECTION 8: HEATING PLANT START-UP
Step 1: Planning Ahead......................................19
Step 2: Start-Up & Adjustments..........................19
Step 3: How To Change Orifices.........................21
APPENDICES
A: Breeching/Chimney Sizing..............................22
B: Gas Pipe Sizing..............................................24
C: Control Guidelines..........................................26
D: Field Installation of Vent Damper....................31
Replacement Parts List.......................................32
MRC2-1103
42-9154
Question and Answer IconNeed help?

Do you have a question about the HydroTherm MultiTemp MR Series and is the answer not in the manual?

HydroTherm MultiTemp MR Series Specifications

General IconGeneral
BrandHydroTherm
ModelMultiTemp MR Series
CategoryBoiler
LanguageEnglish

Summary

SECTION 1: INTRODUCTION

Heating Plant Design and Dimensions

Explains the construction, objective, and physical dimensions of the heating plants.

Code Compliance, Safety, and Shipment

Details installation codes, safety warnings, and shipment information for the heating plants.

SECTION 2: INSTALLING MODULES

Planning Ahead for Module Installation

Covers minimum clearances, combustion air, and foundation requirements before installation.

Module Arrangement and Alignment

Guides on arranging modules, spacing, and leveling them on the foundation.

SECTION 3: INSTALLING WATER PIPING

Water Piping Planning & Components

Discusses piping accessories, anti-freeze, water treatment, and header installation.

Hydronic Components and Hydrotesting

Details installation of hydronic components and hydrotesting for system integrity.

SECTION 4: VENTING THE HEATING PLANT

Venting Planning, Drafthoods & Dampers

Covers planning, installing drafthoods, and vent dampers on module flue outlets.

Vent Connectors & Breeching Runs

Guides connecting vent connectors and sizing/installing breeching runs to the chimney.

SECTION 5: INSTALLING JACKETS

SECTION 6: INSTALLING GAS PIPING

Gas Piping Design & Installation

Guides sizing and installation of gas supply piping, mains, and headers according to codes.

Gas Piping Testing

Outlines procedures for leak testing the gas piping system using soap solution.

SECTION 7: WIRING THE HEATING PLANT

SECTION 8: HEATING PLANT START-UP

Start-Up Planning and Adjustments

Covers pre-start checks, purging, light-off, and initial burner adjustments.

Changing Orifices

Explains how to replace gas orifices to adjust input rate based on gas type and pressure.

APPENDIX A: BREECHING/CHIMNEY SIZING

APPENDIX B: GAS PIPE SIZING

APPENDIX C: CONTROL GUIDELINES

APPENDIX D: FIELD INSTALLATION OF VENT DAMPER