Warnings
Fill the trap with water before firing the boiler to prevent exhaust fumes form
entering the room. Never operate the boiler unless the trap is filled with water.
Ensure all trap fittings are tightened to prevent leakage of flue gas.
Notes
Pipe condensate drain within 1" of a drain or connect to a condensate pump.
Slope the drainage line down to the drain at a pitch of ¼"/Ft, so that the
condensate runs towards the drain.
Checking, cleaning, and filling the condensate trap every 2 months is
important.
120-289R2
Installing the condensate trap (SL 10-85 G3, SL 14-115 G3, SL 20-160 G3, and SL 30-199 G3 boilers)

Other manuals for IBC SL 14-115 G3

Question and Answer IconNeed help?

Do you have a question about the IBC SL 14-115 G3 and is the answer not in the manual?

IBC SL 14-115 G3 Specifications

General IconGeneral
ModelSL 14-115 G3
Heat Exchanger MaterialStainless Steel
Efficiency (%)95%
Condensing TechnologyYes
Heating Capacity14, 000 - 115, 000 BTU/hr
Efficiency95%
Fuel TypeNatural Gas/Propane
Vent Size2"
Input BTU/hr (Natural Gas)14, 000 - 115, 000
Input BTU/hr (Propane)14, 000 - 115, 000
Vent TypeDirect Vent
Heating Capacity (kW)33.7 kW