EasyManuals Logo

IBM 9117-MMB User Manual

IBM 9117-MMB
114 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Page #58 background imageLoading...
Page #58 background image
When placing the system into operating position, ensure that the cables at the back of the system do not
catch or bind as you push the system unit back into the rack.
1. Unlock the blue rail safety latches (A) by lifting them upwards. The rail safety latches are located near
the middle of the system.
2. Push the system unit (B) back into the rack until both system-unit release latches have locked into
position.
3. Replace and tighten the two screws (if present) (A) that secure the system unit (B) to the rack.
Note: Replacing the two shipping screws is optional but should be done in geographic areas that are
prone to seismic activity.
4. Close the front rack door of the unit you are servicing.
Figure 39. Placing the system into the operating position
46 Power Systems: Power supplies for the 9117-MMB, 9117-MMC, 9179-MHB, or 9179-MHC

Table of Contents

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the IBM 9117-MMB and is the answer not in the manual?

IBM 9117-MMB Specifications

General IconGeneral
BrandIBM
Model9117-MMB
CategoryPower Supply
LanguageEnglish

Related product manuals