EasyManua.ls Logo

IBM RS/6000 7014-S00

IBM RS/6000 7014-S00
156 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Step 6. Connect the Power Distribution System
What do I do next?
Three power distribution systems are available with the Model S00 rack: a power
distribution panel (-48 V DC), circuit breaker panels (-48 V DC), or a power
distribution bus (AC).
If a power distribution panel is installed on your rack, perform “Step 6.1. Connect
the Power Distribution Panel.”
If a circuit breaker panel is installed on your rack, skip to “Step 6.2. Connect the
Circuit Breaker Panels” on page 2-30.
If a power distribution bus is installed in the rack, skip to “Step 6.4. Connect the
Power Distribution Bus” on page 2-34.
Step 6.1. Connect the Power Distribution Panel
Note: The customer is responsible for providing and connecting the -48 V DC
power cables and the return power cables from the customer's -48 V DC
power sources to the power distribution panel (PDP) of the -48 V DC Model
S00 rack. The customer is also responsible for connecting the
customer-supplied ground cable to the rack frame.
CAUTION:
Energy hazard, remove power before servicing.
1. At the customer's -48 V DC power source, switch off all power for any -48 V DC
power sources that will be connected to the power distribution panel (PDP).
2. After the customer's -48 V DC power sources are switched off, place a tag or
label over the power source switches (or fuses) to indicate that the power
sources are intended to be switched off.
Chapter 2. System Installation 2-25

Related product manuals