EasyManua.ls Logo

IBM RS/6000 H50 - Page 43

IBM RS/6000 H50
327 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Step 1520-3
Does the power light on the operator panel commence flashing within 30
seconds after applying AC power?
NO Go to “Step 1520-13” on page 2-20.
YES Go to “Step 1520-4.”
Step 1520-4
Is the power light on the operator panel flashing but the operator panel is
blank?
NO Go to “Step 1520-5” on page 2-14.
YES Go to “Step 1520-13” on page 2-20.
Chapter 2. Maintenance Analysis Procedures 2-13

Related product manuals