Figures
1. Port side of the switch .........2
2. Trunking groups ...........4
3. Rack assembly ...........11
4. Separating the inner and outer rails ....12
5. Mounting the moving portion of the slide and
mounting brackets to the switch .....13
6. Mounting the fixed portion of the rail and the
locking brackets to the rack .......14
7. Inserting slides into the rack rails .....15
8. Detailed view, location of LEDs on the switch 22
9. SFP installation and bail closing......28
10. Removing an SFP ..........29
11. Identifying the origin of failure ......39
© Copyright IBM Corp. 2008, 2014 ix