Do you have a question about the ICA ce 1200 and is the answer not in the manual?
Instructions for selecting a protected location for the UPS installation.
Steps for connecting the UPS to a power receptacle with earth ground.
Guide for installing communication software for UPS monitoring.
Steps to turn on the UPS and connected loads.
Describes UPS operation during line power failure and battery status.
Instructions for safely turning off the UPS and its connected loads.
Ensures the main switch is off and no load is connected before startup.
Connects the UPS power cord to an earthed power outlet.
Initiates the UPS startup sequence by pressing the power button.
Tests inverter operation by disconnecting line power, indicated by LEDs and alarm.
Restores normal operation by reconnecting line power, indicated by LEDs.
Confirms UPS readiness and instructs to connect the equipment to be powered.