Key considerations for the installation site, including fire sources, temperature, spacing, and ventilation.
Adjust machine level using feet, tilting slightly backward for proper drainage.
Connect water supply and drain hoses with appropriate fittings and pressure.
Protect hose, operate within specified environmental and pressure conditions.
Follow installation and operation instructions for proper condition and long-term operation.
Perform regular inspections, including power cutoff, leak checks, and ventilation.
| Production | 120 kg/24h |
|---|---|
| Condenser | Air-cooled |
| Ice Type | Cube |
| Ice Shape | Cube |
| Water Connection | Yes |
| Power Supply | 220-240V/50Hz |