EasyManua.ls Logo

ICP 9MPD - Check Sheet

ICP 9MPD
62 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
START-UP CHECK SHEET
For 90+ Furnace
(Keep this page for future reference)
Dealer Name:
Address:
City, State(Province), Zip or Postal Code:
Business Card Here
Phone:
Owner Name:
Address:
City, State(Province), Zip or Postal Code:
Model Number:
Serial Number:
Type of Gas: Natural:
Which blower speed tap is used?
(Heating) (Cooling).
Temperature of Supply Air:
Temperature of Return Air:
LP:
(°F). or(°C)
(°F) or(°C)
Rise (Supply Temp.-Return Temp.): (°F) or(°C)__
Filter Type and Size:
Fan "Time ON" Setting:
Fan "Time OFF" Setting:
Manual Gas Shut-Off Upstream
of Furnace/Drip- Leg?
Condensate Drain Connected?
YES [_
YES [_
Condensate Drain Trapped? YES [_
NOE_
NO
NO
Transition Pressure switch hose relocated for U/D/H
Application? YES [_ NO [_
Blower Speed Checked? YES [_ NO [_
All Electrical Connections Tight? YES [_ NO [_
Gas Valve OK? YES [_ NO [_
Measured Line Pressure When Firing Unit:
Calculated Firing Rate:(See Checks andAdjustments Sec-
tion).
Temperature Rise (supply-return temperature):(°F)__
Measured Manifold Gas Pressure:
Static Pressure (Ducts): Supply Air Return
Date of Start-Up:
CO?
CO2 ?
Dealer Comments:
44001111400

Related product manuals