Horizontal Left through Top
L_
LM
/
VentDrain
& Clamps
/
,\
Plastic Caps
J Yellowor black
Alternate Orientation
Field
SuppliedTee
TeeTrapWhitePVC
(loosepartsbag)
Single Pressure Switch Detail
\, ii_
Coupling&Clamps
(Optional)
\ /
_n_ ReliefTubeBlackRubber
............... 3/16" (4.8mm)ID
Dual Pressure Switch ......
.....,ii "...../ ,"",,'
,....... / "5
/ DrainTube
/ BlackRubber
/ 1/2"(12,7mm)ID
/ &Clamps
CapandClamp [_
OpenEnd
Flexibletubingconnector
_ /16"(4,8mm)OD (Loose
PartsBag)
ReliefTubeExtension
j BlackRubber3/16" (4.8mm)ID
Cut to Fit (LoosePartsBag)
DrainTubeCorrugated
.... - 5/8.(15,9mm)ID&Clamps
RemoveKObefore
mountingTrap
/
Cutatstraightsection
I
TrapConnection
Preassemble&
insert intofurnace
25-24-70
Representative drawing only_ some models may vary in appearance,
Horizontal Left through Top (SeeFigure16)
Disconnect the hoses from the trap assembly, and remove trap
and trap mounting bracket from the blower compartment. Using
cover plate and gasket provided in the loose parts bag, cover the
hole from the burner compartment to the blower compartment and
secure with screws.
Remove knockout from the side of the furnace casing where drain
tube will exit.
Mount the trap externally to the bottom side of the unit using the
two screws provided in the location shown.
Cut the corrugated tube as shown in the illustration above.
Connect the corrugated hose from the transition to the trap.
Secure connections with clamps.
Remove the black _/2" (12.7mm) ID drain tube from the drain tee.
Install a yellow cap and clamp over the open drain port of the drain
tee.
Connect the black 1/2" (12.7mm) ID drain tube from the Vent Drain
to the trap. Secure connections with clamps.
Connect the 3/16" (4.8mm) ID relief tube to the middle port on the
trap. If an extension is required, use the 3/16" (4.8mm) OD flexible
tubing connector and the black 3/_6" (4.8mm) ID relief tube in the
loose parts bag. Cut tube to length. Secure all connections with
clamps.
Cut an appropriate length of 2" (50.8mm) PVC pipe, long enough
to exit the cabinet and connect the vent drain to either:
• A standard field supplied 2" (50.8mm) PVC tee (N9MP1 or
N9MP2 models), or
• A 2" (50.8mm) PVC coupling fastened onto the drain tee
(N9MPD and *9MPD models)
Install tee trap into bottom section of tee.
Connect the tee trap and the main drain line exiting the casing as
shown in Figure 20.
Note: It is recommended that all PVC piping and fitting
connections be fit up and inspected before final cementing. Both
the external trap and the external tee trap must be primed
before operation, Verify all condensate drain connections are
securely clamped. A coupling and clamps (in loose part bag) may
be installed as shown for future servicing of the vent system.
24
Specifications are subject to change without notice
44001 102404