START-UP CHECK SHEET
For 90+ Furnace
(This sheet is optional. Keep this page for future reference.)
Date of Start-Up:
Dealer Name:
Address:
City, State(Province), Zip or Postal Code:
Phone:
Owner Name:
Address:
City, State(Province), Zip or Postal Code:
Model Number:
Serial Number:
Setup Checks
Check the box when task is complete
All Electrical Connections Tight?
Have hoses been relocated for furnace application
(upflow/horizontal)?
Condensate Drain Connected?
Condensate Drain Trapped?
Manual Gas Shut-Off Upstream of Furnace/Drip-Leg?LU
Gas Valve turned ON? Lj
Type of Gas: Natural: Lj Propane: Lj
Calculated Firing Rate:(See Checks and
Section).
Heating Check
Measured Line Pressure when Firing Unit:
Adjustments
Measured Manifold Gas Pressure:
Temperature of Supply Air:
Temperature of Return Air:
Temperature Rise (supply-return temperature): (o)__
In Rise (see furnace rating plate)? (o)__
Static Pressure (Ducts): Supply Air Return
Which blower speed tap is used? (Heating)
Optional Check: CO ? CO2 ?
Cooling Check
Temperature of Supply Air:
Temperature of Return Air:
Temperature Difference:
Static Pressure (Ducts) cooling: Supply Air
Blower Speed Tap used for cooling:
Dealer Comments:
o)__
(o)__
(o)__
__ Return
Filter Type and Size:
3 Specifications are subject to change without notice. 440 01 1024 04

Other manuals for ICP C9MPD

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the ICP C9MPD and is the answer not in the manual?

ICP C9MPD Specifications

General IconGeneral
BrandICP
ModelC9MPD
CategoryFurnace
LanguageEnglish

Related product manuals