EasyManuals Logo

IDEAL isar HE24 User Manual

IDEAL isar HE24
68 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Page #22 background imageLoading...
Page #22 background image
22
INSTALLATION
isar - Installation and Servicing
24
CONDENSATE PIPE TERMINATION CONFIGURATIONS . . . continued
BOILER
cla7773
3. INTERNAL CONNECTION TO SOIL AND VENT STACK
* Make connection to SVP using a solvent welded saddle
BOILER
External
wall
Ground Level
Termination
to Soak away
cla7774
minimum
500mm
BOILER
External
wall
Ground Level
Open end of pipe
direct into gulley
below grating but
above water level
DRAIN
cla7775
4. TERMINATION TO SOAK AWAY
5. TERMINATION TO DRAIN / GULLEY
Termination into a down pipe can take place providing it can be confirmed that
the down pipe is part of a combined waste and rain water system.
INSTALLATION
203319-3.pmd 27/03/2008, 08:1522

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the IDEAL isar HE24 and is the answer not in the manual?

IDEAL isar HE24 Specifications

General IconGeneral
Boiler TypeCombi
Central Heating Output24kW
DHW Flow Rate9.8 l/min
MountingWall Mounted
Domestic Hot Water Output24 kW
ERP RatingA
Output24 kW
Central Heating Flow Temperature Range30-80°C
Dimensions700 x 395 x 278 mm
Warranty2 Years
Fuel TypeNatural Gas
Efficiency RatingA Rated

Related product manuals