35
6 ASSEMBLY AND INSTALLATION
GB
3. PLACE THE TOWER ABOVE THE RATTAN
BASE INSERTING IN THE MIDDLE HOLE, OF
RATTAN BASE, THE WATER CONNECTIONS
TUBE WHITE AND ELECTRICAL BLACK
CORD;
H2O
4. FIX THE TOWER TO THE BASE
TIGHTENING THE HEX SOCKET BUTTON
HEAD CAP SCREWS M6X35;
2. FIX FAN COVER AND FAN COVER
SUPPORT TO THE FAN WITH DOMED
CROSSRECESSED SCREWS M5X10;
5. INSERT THE HOLE CAPS.
1
2
4
5
3
Copyright ©2017 Idrobase Group. All rights reserved.