EasyManua.ls Logo

IDROBASE AURORA - Page 14

Default Icon
26 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
36
6  ASSEMBLY AND INSTALLATION
GB
5
6
7
6. INSERT THE CENTERING PINS IN THE
TWO SEMITABLES.
7. JOIN THE TWO SEMITABLES POSITIONED
ABOVE THE BRACKETS ATTACHED TO THE
RATTAN TOWER.
8. FIX SEMITABLES TIGHTENING THE HEX
SOCKET BUTTON HEAD CAP SCREWS M6X15
9. SCREW IN NOZZLES
THE INSTALLER MUST SECURELY TO THE FLOOR GROUND THE MACHINE WITH AT LEAST 3 SCREWS OF THE INSTALLER TO
CHOOSE THE METHOD SO AS NOT TO COMPROMIZE THE STABILITY OF STRUCTURE AND COMPONENTS IN IT.
Copyright ©2017 Idrobase Group. All rights reserved.