Innovative DisplayWorks
GCG-10
6
PREPARATION PRIOR TO OPERATION
• Remove all packaging materials before using cooler.
This includes: foam pedestal, adhesive tape (used to x accessories) and protective gaskets.
• Inspect cooler for concealed damage. Immediately le a claim with the freight carrier if there is damage. IDW is not
responsible for damage incurred during shipping.
• For proper operation, place the cooler on a dry, level surface.
• Clean the interior surface with a soft cloth and lukewarm water before operation.
• Keep cooler in an upright position for 30 minutes prior to use.
• IDW requires that a sole use circuit be dedicated for the unit. Failure to do so voids warranty.
WARNING: Do not use extension cords.
WARNING: Compressor warranties are void if compressor burns out due to low voltage.
WARNING: Power supply cord should not be removed or altered in any way.
Leveling
• Set unit in its nal location, making certain there is adequate ventilation in the room.
WARNING: Warranty is void if ventilation is insufcient.
• Proper leveling of the GCG-10 cooler is critical to it operating correctly. Condensation removal and door operation will
be affected by leveling.
< The cooler should be leveled front to back and side to side with a level.
• Ensure that drain hose or hoses are positioned in the pan.
• Remove plug and cord from inside the lower rear of the cooler.
• The unit should be placed close enough to the electrical supply so that extension cords are
never used.
Shelving Installation
• Securely insert shelf clips into pilasters
• Shelf clips should be level so shelf lays fl at
• Place shelf on shelf clips