Innovative DisplayWorks
G-10f/GCG-10f
6
PREPARATION PRIOR TO OPERATION
• Removeallpackagingmaterialsbeforeusingcooler.
Thisincludes:foampedestal,adhesivetape(usedtoxaccessories)andprotectivegaskets.
• Inspectcoolerforconcealeddamage.Immediatelyleaclaimwiththefreightcarrierifthereisdamage.
IDWisnotresponsiblefordamageincurredduringshipping.
• Forproperoperation,placethecooleronadry,levelsurface.
• Cleantheinteriorsurfacewithasoftclothandlukewarmwaterbeforeoperation.
• Keepcoolerinanuprightpositionfor30minutespriortouse.
• IDWrequiresthatasoleusecircuitbededicatedfortheunit.Failuretodosovoidswarranty.
WARNING:Donotuseextensioncords.
WARNING:Compressorwarrantiesarevoidifcompressorburnsoutduetolowvoltage.
WARNING:Powersupplycordshouldnotberemovedoralteredinanyway.
Leveling
•Setunitinitsnallocation,makingcertainthereisadequateventilationintheroom.
WARNING:Warrantyisvoidifventilationisinsufcient.
•ProperlevelingoftheG-10f/GCG-10fcooleriscriticaltoitoperatingcorrectly.Condensationremovaland
dooroperationwillbeaffectedbyleveling.
< The cooler should be leveled front to back and side to side with a level.
•Ensurethatdrainhoseorhosesarepositionedinthepan.
•Removeplugandcordfrominsidethelowerrearofthecooler.
•Theunitshouldbeplacedcloseenoughtotheelectricalsupplysothatextension
cordsareneverused.
Shelving Installation
• Securely insert shelf clips into pilasters
• Shelf clips should be level so shelf lays at
• Place shelf on shelf clips
(Maximum load per shelf is 30kg)