EasyManua.ls Logo

IEC CPY 04 - Valve Package Installation and Maintenance; Condensate Drain

Default Icon
20 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Fan Coils
INSTALLATION, OPERATION, & MAINTENANCE MANUAL
7
SECTIONONE—Receipt&InitialInstallation,Cont'd.
BEFOREbeginningtheconnectionofthevariouscooling
and/orheatingmediumstotheunit.
Horizontal Unit Drain Pan Removal
CXB,CBY,CHYandCPYHorizontalmodelscomewitha
removabledrainpan.Thedrainpanshouldberemoved
beforeinstallingorservicingthevalvepackage.An
extendeddrillbitmaybenecessarytoaccessthescrews
toremovethedrainpan.
NOTE: Exact location of screws to remove drain pan may vary based
on Horizontal model.
Valve Package Installation and Maintenance
Allaccessoryvalvepackagesshouldbeinstalledas
required,andallservicevalvesshouldbecheckedfor
properoperation.
Ifcoilandvalvepackageconnectionsaretobemadewith
a“sweat”orsolderjoint,careshouldbetakentoassure
thatnocomponentsinthevalvepackagearesubjected
toahightemperaturewhichmaydamagesealsorother
materials.Manytwo-positionelectriccontrolvalves,
dependingonvalveoperation,areprovidedwithamanual
openinglever.Thislevershouldbeplacedinthe“open”
positionduringallsolderingorbrazingoperations.
Ifthevalvepackageconnectionatthecoilismadewith
aunion,thecoilsideoftheunionmustbeprevented
fromtwisting(“backedup”)duringtighteningtoprevent
damagetothecoiltubing.Over-tighteningmustbe
avoidedtopreventdistorting(“eggshaping”)theunion
sealsurfaceanddestroyingtheunion.
Thesupplyandreturnconnectionsaremarkedonthecoil
stub-outsandthevalvepackage,withan“S”meaning
supplyorinletand“R”meaningreturnoroutletindicating
owdirectiontoandfromthecoil.Bluelettersmarkthe
chilledwaterconnectionsandredlettersmarkthehot
waterorsteamconnections.Inthecaseofeld-installed
valvesandpiping,thechilledwatervalvecluster(or
expansionvalveonDXunits)shouldbeinstalledinsuch
awaythatanydrippingorsweatingiscontainedinthe
drainpanorotherdevicesuchasanoptionalextended
drainpanorfactorydriplip.Factorydriplipsareeld
installedandmaybepackagedseparatelyfromtheunit.
Factorysuppliedcoolingcoilvalvepackageswillbe
arrangedtolocateasmuchofthepackageaspossible
overastandarddriplip.
Ifnoneoftheabovefactoryaccessorieshavebeen
providedwiththeunits,adriplip(availablefromthe
factory)maystillberequiredtodirectpipingcondensate
intotheunitdrainpan.
Aftertheconnectionsarecompleted,thesystemshould
thenbetestedforleaks.Sincesomecomponentsarenot
designedtoholdpressurewithagas,hydronicsystems
shouldbetestedwithwater.Pressuretestingshouldbe
completedpriortosheetrockingorpainting.
CAUTION: All water coils must be protected
from freezing after initial lling with water.
Even if the system is drained, unit coils may still hold
enough water to cause damage when exposed to
temperatures below freezing.
Refrigerantsystemsshouldbetestedwithdrynitrogen
ratherthanairtopreventtheintroductionofmoisture
intothesystem.Intheeventthatleakingordefective
componentsarediscovered,theSalesRepresentative
mustbenotiedBEFOREanyrepairsareattempted.
Allleaksshouldberepairedbeforeproceedingwiththe
installation.
Aftersystemintegrityhasbeenestablished,thepiping
shouldbeinsulatedinaccordancewiththeproject
specications.Thisistheresponsibilityoftheinstallingor
insulationcontractor.Allchilledwaterpipingandvalves
orrefrigerantsuctionpipingnotlocatedoverdrainpans
ordriplipsmustbeinsulatedtopreventdamagefrom
sweating.Thisincludesfactoryandeldpipinginsidethe
unitcabinet.
Condensate Drain:Thedrainshouldalwaysbeconnected
andpipedtoanacceptabledisposalpoint.Forproper
moisturecarry-off,thedrainpipingshouldbeslopedaway
fromtheunitatleast1/8inchperfoot.Adraintrapmay
berequiredbylocalcodesanditisstronglyrecommended
forodorcontainment.Whenfurnished,theoptional5/8-
inchsecondaryor“tell-tale”connectionmustbepipedto

Related product manuals