EasyManua.ls Logo

IEC CPY 08 - User Manual

Default Icon
20 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
Loading...
EnergyEfcient
EasytoInstall
ExtendedServiceLife
FanCoils
INSTALLATION,OPERATION,&MAINTENANCEMANUAL
- Energyefcientcompactblowercoils
- Idealforeducational,hospitality,multi-family,orothercommercialenvironments
- Designedforductedapplications
- NominalCFMrangeof600to3,000CFM
Question and Answer IconNeed help?

Do you have a question about the IEC CPY 08 and is the answer not in the manual?

IEC CPY 08 Specifications

General IconGeneral
BrandIEC
ModelCPY 08
CategoryAir Conditioner
LanguageEnglish

Summary

Receipt and Initial Installation

Inspection and Handling

Procedures for receiving, inspecting, and safely handling the unit upon delivery.

Installation and Connections

Guidance on unit mounting, securing, and connecting all required services like water, drain, ductwork, and electrical.

Start Up Procedures

General Start-up Overview

Overview of prerequisites and initial checks before system start-up, including building completion.

Cooling;Heating System Preparation

Steps for filling, venting, and flushing water systems before operation to remove debris.

Air System Balancing

Procedures for balancing airflow and fan system conditions for optimal performance.

Motor and Control Adjustments

Adjusting fan speeds and settings for ECM motors and variable airflow systems.

Water Treatment Recommendations

Guidance on water quality parameters and treatment for hydronic systems.

Normal Operation and Periodic Maintenance

Maintenance Schedule and General Principles

Establishing a routine maintenance schedule and logging unit performance for optimal service life.

Motor, Blower, and Coil Servicing

Procedures for cleaning and servicing fan motors, blowers, and heat coils.

Electrical System Checks and Controls

Verifying electrical connections and inspecting controls for proper operation and reliability.

Filter and Drain Maintenance

Instructions for replacing throwaway filters, cleaning permanent filters, and checking drains.

Valves, Piping, and Replacement Parts

Guidelines for maintaining valves, piping, and ordering correct replacement parts.

Equipment Start-up Checklist

Receiving and Inspection Checklist

Items to verify for unit receipt, completeness, and correct arrangement.

Handling and Installation Checklist

Checks for proper mounting, access, electrical service, and removal of shipping restraints.

Connections and System Checks

Verification of cooling/heating connections, ductwork, electrical conditions, and flushing water systems.

Related product manuals