INSTALLATION,OPERATION,&MAINTENANCEMANUAL
- Energyefcientcompactblowercoils
- Idealforeducational,hospitality,multi-family,orothercommercialenvironments
- Designedforductedapplications
- NominalCFMrangeof600to3,000CFM
Question and Answer IconNeed help?

Do you have a question about the IEC C Y 02 Series and is the answer not in the manual?

IEC C Y 02 Series Specifications

General IconGeneral
BrandIEC
ModelC Y 02 Series
CategoryAir Conditioner
LanguageEnglish

Summary

SECTION ONE - Receipt & Initial Installation

Preface

Introduction to the fan coil unit manual and its purpose.

Unpacking and Inspection

Procedures for checking equipment upon arrival and identifying potential damage.

Handling and Installation

Guidelines for safely moving and installing the fan coil units.

Installation Instruction for Ceiling Hung Units

Specific instructions for mounting units suspended from ceilings.

Cooling;Heating Medium Connections

Details on connecting chilled water, hot water, or steam lines to the unit.

Horizontal Unit Drain Pan Removal

Steps to remove the drain pan for access to other components.

Valve Package Installation and Maintenance

Guidance on installing and maintaining valve packages for fluid control.

Condensate Drain

Instructions for proper connection and maintenance of the condensate drain system.

Ductwork Connections

Procedures for connecting supply and return air ductwork to the units.

Electrical Connections

Steps for safely making electrical connections to the fan coil unit.

Exposed Unit Touch Up and Repainting

Instructions for cosmetic repairs to the unit's exterior finish.

SECTION TWO - Start Up

General

Overview of initial start-up procedures and site readiness.

Cooling;Heating System

Procedures for filling, venting, and flushing water coils before operation.

Air System Balancing

Steps for ensuring proper airflow distribution and unit performance.

Eco-telligent Motor

Specific considerations for starting up units equipped with ECM blower motors.

Water Treatment

Recommendations for water quality and treatment for hydronic systems.

Water System Balancing

Process for balancing water flow rates and temperatures in hydronic systems.

Controls Operation

Verification of control system functionality and sequence of operations.

SECTION THREE - Normal Operation & Periodic Maintenance

General

Guidelines for establishing a maintenance schedule for unit longevity.

Motor;Blower Assembly

Maintenance procedures for the motor and blower components.

Coil

Methods for cleaning and maintaining the heat exchange coils.

Electric Resistance Heater Assembly

Maintenance and operational considerations for electric heating elements.

Electrical Wiring and Controls

Inspection and maintenance of electrical components and control systems.

Valves and Piping

Inspection of valves and piping for leaks and proper function.

Filters, Throwaway

Recommendations for regular replacement of disposable air filters.

Filters, Permanent

Guidelines for cleaning and maintaining reusable permanent air filters.

Drain

Checking and clearing the condensate drain system for proper operation.

Replacement Parts

Information on ordering and using genuine replacement parts.

SECTION FOUR - Equipment Start-up

Check List - IMPORTANT

Comprehensive checklist for verifying unit and system readiness before operation.