EasyManuals Logo

IEC C Y 02 Series User Manual

Default Icon
20 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Page #11 background imageLoading...
Page #11 background image
Fan Coils
INSTALLATION, OPERATION, & MAINTENANCE MANUAL
11
SECTIONTWO—StartUp,Cont'd.
3-Speed, Potentiometer Adjustment (Eco V 2 Only)
Potentiometer
Low, Med, High CFM adjust
TheunithasbeenfactoryconguredtoproducePSC
equivalentairowonhighspeed,withmediumandlow
speedsetat80%and60%ofhigh,respectively.Ifthese
settingareacceptable,thennofurtherconguringis
required.
Ifalternativeairowsaredesired,useboardmountedpots
toadjusttheairowassociatedwitheachinput.Each
outputcanbeadjustedfrom0to100%ofthemotor’s
factoryprogrammedoperatingrange.Usevoltmeterand
airowchart(oncontrolboxcover)tosetvalues.Referto
AppendixAforadjustmentprocedure.
4-Speed, Solid State with Potentiometer
SeephotoinAppendixBonpage18.Theunithasbeen
factoryconguredtoproducePSCequivalentairowon
highspeed,withmediumandlowspeedsetat80%and
60%ofhigh,respectively.Ifthesesettingareacceptable,
thennofurtherconguringisrequired.
Boardmountedpotsareprovidedtoadjusttheairow
pertainingtoeachoutput.Eachoutputcanbeadjusted
from0to100%ofthemotor’sfactoryprogrammed
operatingrange.Usevoltmeterandairowchart(on
controlboxcover)tosetvalues.RefertoAppendixBfor
adjustmentprocedure.
Variable Airow for 0-10 VDC
Flo 1, 2, & 3 Terminals
Flo 0 & 4 Terminals
Com
Pot Adjustment
Flo 1, 2, & 3
(in the Field)
Pot Adjustment
Flo 0 & 4
(Contact Factory)
IfafactoryprovidedthermostatorDDCcontrolleris
utilized,thentheunitisalreadycorrectlycongured.
IECrecommendsusingthespeciedthermostatorDDC
controllertocommissiontheunitwheneverpossible.
However,theblowercanbestartedandoperatedwithout
thethermostat.Todoso,locatejumper7nearthelarge
capacitor.MoveJ7from0-10toMan.Oncemoved,the
on-boardpotscontrolfanspeed.Toswitchthefaninthis
conguration,placeadrycontactin-lineontheenablewire.
Eco 2 Variable Airow for 0-10 VDC
Nocontrolboardisrequiredandnoeldadjustmentsare
possible.Motoruses0-10VDCsignaldirectly.Seecontrol
boxlabel.Fanenableat1.5VDC.
Water Treatment
Properwatertreatmentisaspecializedindustry.IEC
recommendsconsultinganexpertinthiseldtoanalyze
thewaterforcompliancewiththewaterqualityparameters
listedbelow,andtospecifytheappropriatewatertreatment
regimen.Theexpertmayrecommendtypicaladditivessuch
asrustinhibitors,scalingpreventative,antimicrobialgrowth
agents,oralgaepreventatives.Anti-freezesolutionsmay
alsobeusedtolowerthefreezingpoint.
IECwatercoiltubesandheadersareconstructedofpure
copper.Multiplebrassalloysmaybepresentinthevalve

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the IEC C Y 02 Series and is the answer not in the manual?

IEC C Y 02 Series Specifications

General IconGeneral
BrandIEC
ModelC Y 02 Series
CategoryAir Conditioner
LanguageEnglish

Related product manuals