INSTALLATION,OPERATION,&MAINTENANCEMANUAL
4
SECTIONONE—Receipt&InitialInstallation
Preface
InternationalEnvironmentalCorporationfancoilunits
representaprudentinvestmentofferingtrouble-free
operationandlongservicewithproperinstallation,
operation,andregularmaintenance.
Your equipment is initially protected under the
manufacturer’s standard warranty; however, this
warranty is provided under the condition that the steps
outlined in this manual for initial inspection, proper
installation, regular periodic maintenance, and everyday
operation of the equipment be followed in detail. This
manual should be fully reviewed in advance before initial
installation, start-up, and any maintenance. Should
any questions arise, please contact your local Sales
Representative or the factory BEFORE proceeding.
Theequipmentcoveredbythismanualisavailablewitha
varietyofoptionsandaccessories.Consulttheapproved
unitsubmittals,orderacknowledgment,andothermanuals
forspecicdetailsonunitoptionsandaccessories.
No attempt should be made to handle, install, or service
any unit without following safe practices regarding
mechanical equipment.
The equipment must always be properly supported.
Temporary supports used during installation or service
must be adequate to hold the equipment securely.
All power must be disconnected before any installation
or service is attempted. More than one power source
may be supplied to a unit. Power to remote mounted
control devices may not be supplied through the unit.
Never wear bulky or loose tting clothing when working
on any mechanical equipment. Gloves should always
be worn for protection against heat and other possible
injuries. Safety glasses or goggles should always be
worn, especially when drilling, cutting, or working with
chemicals such as refrigerants or lubricants.
Never pressurize any equipment beyond specied test
pressures as shown on unit rating plate. Always pressure
test with an inert uid or gas such as clear water or dry
nitrogen to avoid possible damage or injury in the event
of a leak or component failure during testing.
Always protect adjacent ammable material when
welding or soldering. Use a suitable heat shield material
to contain sparks or drops of solder. Have a re
extinguisher readily available.
Themanufacturerassumesnoresponsibilityforpersonal
injuryorpropertydamageresultingfromimproperor
unsafepracticesduringthehandling,installation,service,
oroperationofanyequipment.
Unpacking and Inspection
Allunitsarecarefullyinspectedatthefactorythroughout
themanufacturingprocessunderastrictdetailedquality
assuranceprogram.Allmajorcomponentsandsub-
assembliesarecarefullytestedforproperoperation
andveriedforfullcompliancewithfactorystandards.
Operationaltestingofsomecustomer-furnished
componentssuchaspneumaticcontrolvalvesand
switchesmaybeapossibleexception.
Eachunitiscarefullypackagedforshipmenttoavoid
damageduringnormaltransitandhandling.Equipment
shouldalwaysbestoredinadryandcoveredlocationand
intheproperorientationasmarkedonthecarton.
AllshipmentsaremadeF.O.B.factoryanditisthe
responsibilityofthereceivingpartytoinspectthe
equipmentuponarrival.Anyobviousdamagetothe
cartonand/oritscontentsshouldberecordedonthebillof
ladingandaclaimshouldbeledwiththefreightcarrier.
Afterdeterminingtheconditionofthecartonexterior,
carefullyremoveeachunitfromthecartonandinspect
forhiddendamage.Atthistime,checktomakesurethat
“furnishedonly”itemssuchasswitches,thermostats,etc.
areaccountedfor.Anyhiddendamageshouldberecorded
andimmediatelyreportedtothecarrierandaclaimled.
Intheeventaclaimforshippingdamageisled,theunit,
shippingcarton,andallpackingmustberetainedfor
physicalinspectionbythefreightcarrier.Allequipment
shouldbestoredinthefactoryshippingcartonwith
internalpackinginplaceuntilinstallation.
Atthetimeofreceipt,theequipmenttypeand
arrangementshouldbeveriedagainsttheorder
documents.Shouldanydiscrepancybefound,thelocal

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the IEC CPY 12 and is the answer not in the manual?

IEC CPY 12 Specifications

General IconGeneral
BrandIEC
ModelCPY 12
CategoryAir Conditioner
LanguageEnglish

Related product manuals