EasyManua.ls Logo

IEC HPY 14 - Start Up Procedures; General Start-up Guidelines

Default Icon
20 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Fan Coils
INSTALLATION, OPERATION, & MAINTENANCE MANUAL
9
SECTIONTWO—StartUp
mustbewiredinstrictaccordancewiththewiring
diagramthatappearsontheunit.Failuretodosocould
resultinpersonalinjuryordamagetocomponents,and
willvoidallmanufacturer’swarranties.
Thefanmotor(s)shouldneverbecontrolledbyany
wiringordeviceotherthanthefactory-furnishedswitch
orthermostat/switchcombinationwithoutfactory
authorization.Fanmotor(s)maybetemporarilywiredfor
useduringconstructiononlywithpriorfactoryapprovalin
strictaccordancewiththeinstructionsissuedatthattime.
Unitswithoptionalfactory-furnishedandinstalled
aquastatsmaybeshippedwiththeaquastatsmountedon
acoilstub-out.Removetheaquastatbeforeinstallationof
avalvepackage.Consultthefactorypipingdiagraminthe
approvedsubmittalsforproperlocationwhenreinstalling
theaquastats.Ifthevalvepackageiseld-furnished,the
aquastatmustbeinstalledinalocationwhereitwillsense
thewatertemperatureregardlessofcontrolvalveposition.
Ableedbypassmayberequiredtoguaranteeproper
aquastatoperation.
Alleldwiringshouldbedoneinaccordancewith
governingcodesandordinances.Anymodicationofthe
unitwiringwithoutfactoryauthorizationwillvoidallofthe
factorywarranties,andwillnullifyanyagencylistings.
Themanufacturerassumesnoresponsibilityforany
damagesand/orinjuriesresultingfromimpropereld
installationand/orwiring.
Exposed Unit Touch-up and Repainting
Exposedcabinetunitsmaybefurnishedwithabaked
enamelnish.Smallscratchesinthisnishmaybe
repairedwithtouch-uppaintavailablefromthefactory.
Somecolorsoftouch-uppaintareavailableinaerosol
containersandalltouch-uppaintisavailableinpint,quart,
andgalloncans.Contactthefactoryforavailability.
Propersafetyproceduresshouldbefollowedregarding
ventilationandsafetyequipment.Themanufacturer’s
directionsshouldbefollowedfortheproductsbeingused.
Torepaintthefactory-bakedenamel,thenishshouldbe
preparedbylightsandingwith#280gritsandpaper,or
#000or#0000nesteelwool.Thesurfacemayalsobe
wipedwithaliquidsurfaceetchcleaningproductsuchas
“NoSand”or“Pasceo.”Theseitemsshouldbeavailable
atmostpaintproductstores.Itshouldbenotedthatthe
moreconscientiouslythispreparationisdone,themore
effectiveitwillbe.
Afterthispreparationisaccomplished,thefactorynish
shouldprovideexcellentadhesionforavarietyofair-dried
topcoats.Enamelwillgiveamoredurable,highergloss
nish,whilelatexwillnotadhereaswellandwillgive
adull,softernish.Topcoatsinvolvinganexothermic
chemicalprocessbetweentwocomponents,suchas
epoxiesandurethanes,shouldbeavoided.
Factoryaerosoltouch-uppaintmayrequireanumber
oflight“dustcoats”toisolatethefactory-bakedenamel
nishfromthequickdryingtouch-uppaint.
SECTIONTWO–StartUp
General
Beforebeginninganystart-upoperation,thestart-up
personnelshouldfamiliarizethemselveswiththeunit,
optionsandaccessories,andcontrolsequenceto
understandthepropersystemoperation.Allpersonnel
shouldhaveagoodworkingknowledgeofgeneral
start-upproceduresandhavetheappropriatestart-up
andbalancingguidesavailableforconsultation.
Thebuildingmustbecompletelynishedincludingdoors,
windows,andinsulation.Allinternalwallsanddoors
shouldbeinplaceandinthenormalposition.Insome
casestheinteriordecorationsandfurnituremayinuence
overallsystemperformance.Theentirebuildingshould
beascompleteaspossiblebeforebeginninganysystem
balancing.
Theinitialstepinanystart-upoperationshouldbeanal
visualinspection.Allequipment,plenums,duct-work,and
pipingshouldbeinspectedtoverifythatallsystemsare
completeandproperlyinstalledandmounted,andthatno
debrisorforeignarticlessuchaspaperordrinkcansare
leftintheunitsorotherareas.

Related product manuals