EasyManua.ls Logo

Igema FARB2 - Page 17

Igema FARB2
32 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
17
6 Fitting the TDS probe
It is essential to remove the cardboard protective tube for transport before
installation!!
If several probes are screwed into one flange, the probe plug and the
associated probe should be labelled to prevent confusion!
Screw connection of the TDS probe
Unscrew the probe plug
Clean and check sealing surfaces
Insert (new) sealing ring
Grease the thread with heat-resistant solid lubricant (e.g. graphite).
Screw in and tighten the probe, max. tightening torque Md = 140 Nm.
Fit into the boiler before connecting the power.
Do not seal thread with PTFE tape or the like!
When commissioning the boiler, check the probe screw connection in the
flange for leaks and retighten if necessary!
Caution
Info
Caution