43
47
Funzionamento
pompa di calore
Se dopo il tempo di
attivazione non si
raggiunge la temperatura
impostata parte
il generatore termico
Funzionamento
pompa di calore
Se dopo il tempo di
attivazione moltiplicato
per 2 non si raggiunge
la temperatura impostata
parte il
generatore termico
Set Risc
55 °C
Max
Min
Temp
esterna
Te2 25Te1-15
Funzionamento
esclusivo del
generatore termico
INSTALLERUSERMAINTENANCE TECHNICIAN
3.24 YEARLY APPLIANCE CHECK AND
MAINTENANCE.
e following checks and maintenance should
be performed at least once a year.
- Clean the ue side of the heat exchanger.
- Clean the main burner.
- Check the correct positioning, integrity and
cleanliness of the detection and ignition elec-
trodes; remove any oxide present.
- If deposits are detected in the combustion
chamber they must be removed and the heat
exchanger coils must be cleaned using nylon
or broomcorn brushes; it is forbidden to use
brushes made of metal or other materials that
may damage the combustion chamber.
- Check the integrity of the insulating panels
inside the combustion chamber and if damaged
replace them.
- Visually check for water leaks or oxidation
from/on connections and traces of condensate
residues inside the sealed chamber.
- Check the contents of the condensate drain
trap.
- Via the condensate drain cap check that there
are no residues of material that clog condensate
passage; also check that the entire condensate
drainage circuit is free and ecient.
In the event of obstructions (dirt, sediment,
etc.) with consequent leakage of condensate
in the combustion chamber, one must replace
the insulating panels.
- Check that the burner seal gaskets and the lid
are intact and perfectly ecient, otherwise
replace them. In any case the gaskets must be
replaced at least every two years, regardless of
their state of wear.
- Check that the burner is intact, that it has no
deformations or cuts and that it is properly
xed to the combustion chamber lid; otherwise
it must be replaced.
- Visually check that the water safety drain valve
is not blocked.
- Check, aer discharging the system pressure
and bringing it to zero (read on indoor unit
pressure gauge), that the expansion vessel
charge is at 1.0 bar.
- Check that the domestic hot water expansion
vessel charge is at a pressure between 3 and 3.5
bar.
- Check that the system static pressure (with
system cold and aer relling the system by
means of the lling valve) is between 1 and 1.2
bar.
- Check visually that the safety and control
devices have not been tampered with and/or
shorted, in particular:
- temperature safety thermostat;
- system pressure switch
- Check the integrity of the storage tank Magne-
sium Anode (if present).
- Check the condition and integrity of the elec-
trical system and in particular:
- electrical power cables must be inside the
fairleads;
- there must be no traces of blackening or
burning.
- Check correct lighting and operation.
- Ensure correct calibration of the burner in
domestic water and heating phases.
- Check correct operation of control and adjust-
ment devices and in particular:
- system control thermostat intervention;
- domestic hot water control thermostat inter-
vention.
- Check sealing eciency of gas circuit and the
internal system.
Values Te1 and Te2 are determined by the logic of the product board
(Setting the manual mode "I 05" = "MA" the "Te1" value matches "I 06" and the "Te2"
value corresponds to "I 06" + 5 °C)
- Check the intervention of the device against no
gas ionisation ame control. Intervention time
must be less than 10 seconds.
N.B.: in addition to yearly maintenance, one
must also check the thermal system, with fre-
quency and procedures that comply with the
indications of the technical regulations in force.
Operation in central heating mode
Exclusive heat
generator operation
Heat pump operation
If after activation time
the set temperature is not
reached the heat generator
starts
Heat pump operation
If after activation time
multiplied by 2 the set
temperature is not reached
the heat generator starts
Set Risc (CH Set)
External temp