Lat Pulldown / Vertical Row Assembly
─ 65 ─
1. Attach two Small Top Frame ASSY (#12) to the Top Frame II ASSY (#5) using:
● four M10*75 Hex Head Bolt (#116)
● eight Φ11*Φ20*2 Flat Washer (#105)
● four M10 Nylon Lock Nut (#115)
2. Attach the Tube Frame ASSY (#11) to the Vertical Frame II ASSY (#2) using:
● two M10*60 Hex Head Bolt (#121)
● four Φ11*Φ20*2 Flat Washer (#105)
● two M10 Nylon Lock Nut (#115)
3. Attach the Foot Tube ASSY (#39) to the Connection Frame (#3) using:
● two M10*75 Hex Head Bolt (#116)
● one R24 Fixed Plate (#4)
● four Φ11*Φ20*2 Flat Washer (#105)
● two M10 Nylon Lock Nut (#115)
4. Attach the FOAM Frame ASSY (#28) to the Bottom Frame II ASSY (#1).
Note: Wrench Tighten bolts and Nylon Lock Nuts.
1. Attach:
● four Φ25*2.5*1695 Guide Rods (#17)
● two Φ25*2.5*1863 Guide Rods (#15)
● six Weight Rubber Bumper (#103)
● fifty seven Weight Plate 10LBS (#19)
● three Top Plate (#29)
to the Middle Frame II ASSY (#7) & the Top Frame II ASSY (#5) using:
● six Mount Sleeve (#123)
● twelve M8*8 Socket Set Screw (#114)
2. Attach the three Selector Pin W/Coil (#102) to the three Top Plate (#29).
Note: Wrench Tighten bolts and Nylon Lock nuts.
STEP 4
STEP 5