EasyManua.ls Logo

Index R200 - Maintenance Summary - 4.000 Operating Hours

Index R200
122 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Maintenance Summary - 4.000 Operating hours
It is recommended to document the maintenance activities carried out by using the appropriate
maintenance log. The maintenance log has the document number LR1702.10191 - 05.06.2019.
D010 - Cleaning of the machine
D020 - Check the pressure accumulator
D050 - Check the lubrication system
D060 - Check the pneumatic system
D077 - Check tool clamping sets of the milling spindles (from Berg)
D095 - Check main and counter spindles
D125 - Replace cooling lubricant adapter (HSK tool mountings)
D170 - Check the system for reconditioning the cooling lubricant
D180 - Check fire extinguishing system (visual inspection)
D330 - Replace belts and check belt tension
D370 - Check and potentially replace the end position dampers
D440 - Replacing hydraulic fluid
D500 - Perform data backup
D520 - Check control cabinet and cable assemblies (visual inspection)
D640 - Check setting of electrical fuses
Maintenance Summary - 4.000 Operating hours
74
Maintenance Instructions
R200
LR1702.10181 - 05.06.2019

Table of Contents