innovair UV36C2DB1 Specifications

General IconGeneral
Phase1
Frequency (Hz)60
Cooling Capacity (BTU/hr)36000
Voltage (V)208/230
RefrigerantR410A

Summary

Installation Procedure

Location Selection

Indoor Unit Location Selection

Criteria for selecting the indoor unit's location, ensuring structural support, proper drainage, and good air circulation.

Outdoor Unit Location Selection

Criteria for outdoor unit location, focusing on support, proximity, noise, maintenance access, and weather protection.

Indoor Unit Installation

Outdoor Unit Installation

Location Selection

Selecting and checking the suitability of the location for the outdoor unit, observing clearance requirements.

Unit Installation

Guidance on installing the outdoor unit on the ground or roof, ensuring proper support and ventilation.

Refrigerant Pipe Installation

Connecting Pipes Procedure

Details the steps for connecting refrigerant pipes, including measuring, cutting, flaring, and insulating.

Drainage Pipe Installation

Water Discharge Test

Testing water discharge functionality in natural and pump drainage modes, checking pump operation and drainage.

Vacuum Drying and Leakage Checking

Purpose of Vacuum Drying

Explains the purpose of vacuum drying to eliminate moisture and non-condensable gases.

Additional Refrigerant Charge

Engineering of Electrical Wiring

Electrical Wiring Installation Highlights

Key considerations for electrical wiring installation, including qualified electricians and grounding.

Test Operation

Pre-Test Operation Checks

Points to confirm before conducting the test operation, ensuring all installations are complete and correct.

Indoor Unit Test

Procedure for testing the indoor unit's functions and performance after installation.

Outdoor Unit Test

Procedure for testing the outdoor unit's operation, checking for noise and leaks.