6.14. Periodic Test
This function is used to check the integrity of the communication channel between
the alarm center and the monitoring company.
If programmed, periodically will be reported the
Periodic Test
event. Thus, if the
monitoring company does not receive this event in the programmed period, the
communication channel can be considered inoperative.
The
Periodic Test
function can operate in two modes:
» Time: the periodic test event is sent once a day always at the scheduled time. If
this mode is programmed, the test by time interval will be ignored.
» Time interval: the periodic test is sent at programmable time intervals from 1
to 255 hours.
Note:
It is not possible to use both operating modes at the same time, if the test
by time is scheduled the time interval test will be canceled.
Periodic test by time
To program this function, type:
+
470 Hours
+
Enter
+
Enter
hh
+
Minutes
mm
To cancel the periodic test by time, type:
470
+
Enter Enter
+
Deactive
+
To edit/view the programmed value, type:
470
+
Enter Enter
+
After changing the congured value, press the
Enter
key. If you only want to view
the setting, press the
Exit
key and no programming will be changed.
Periodic test by time interval