EasyManua.ls Logo

Intex Krystal Clear C900 - Top Rail and Final Leg Installation

Intex Krystal Clear C900
47 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
(333IO) 42” LADDER WITH REMOVABLE STEPS ENGLISH 4.875” X 7.25” PANTONE 295U 03/30/2022
333
A
S AVE THESE INSTRUCTIONS
Page 7
LADDER SETUP (continued)
3. SIDE C LEGS ASSEMBLY
(refer to figures 3.1 through 3.4):
4. U-SHAPED TOP RAIL INSTALLATION
(refer to figures 4.1 through 4.2):
IMPORTANT:
Make sure the “top brace with locking system” (3) feature is facing outward
(your right side when facing the C legs assembly).
17 (M6*35)
C
C
C
C
18
14
3.3
C
C
3.4
15
18
3.1
C
C
5 (M6*45)
16 (M6*40)
12524A
12525A
4.1
17 (M6*35)
17 (M6*35)
12525A
12524A
4.2
18
3.2
C
C
15

Related product manuals