348
PO
S AVE THESE INSTRUCTIONS
(348PO) SPA ENGLISH 7.5” X 10.3” PANTONE 295U 10/25/2019
English
Page 9
SET UP (continued)
Ination
Inate the Spa Tub Wall
1.
Take out the ground cloth
(19)
and spread it over the cleared area. Then spread out the spa liner over
the ground cloth and point the drain valve towards a suitable draining area.
NOTE:
Spread the ground cloth with the bubbles facing down over the cleared area where you intend
to setup your spa.
2.
Flip up the control base side cover
(4)
to reveal the air blower ination outlet. Pull out the latch to open
the cover, insert the hose adaptor
(24)
with hose
and reattach the latch to the hose adaptor to secure it
in place
(see drawing 2)
.
2
1
2
3
4
5
3
7
1 2
4.1
3.
Unscrew the air valve cap on the spa tub to reveal the stem in the
up position for ination. Insert the other end of the ination hose
(7)
into the valve and turn to the right to lock it in position
(see
drawing 3)
.
NOTE:
If necessary, adjust the spa tub external lining
(32)
relative
to the spa tub
(16)
in order to align the openings with the air valve
and the connection ttings.
4.
Press the button to turn on the control panel. Press the
button to inate the spa tub wall for 8 to 10 minutes until it is rm
to the touch but not hard
(see drawings 4.1 & 4.2)
. During the
ination process check that the spa tub external lining
(32)
top
surface is fully extended and covering the spa tub
(16)
top air
chamber surface, make adjustment as needed. After ination a
few wrinkles may be present on the spa tub external lining, this is
normal.
IMPORTANT:
Do not over inate or use high pressure air
compressor to inate.