EasyManua.ls Logo

intrepid 9M - Page 12

Default Icon
52 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
RIGGING CHECKLIST
34. ____________ ________ Check all fasteners on spars for tightness.
35. ____________ ________ Reeve halyards.
36. ____________ ________ Attach stays, shrouds, spreaders and topping
lifts.
37. ____________ ________ Check all clevis pins and cotter pins for
security. tape all potential chafe points
including spreader bases and ends.
38. ____________ ________ Check wiring of combination deck and bow
light. Be sure bulbs work.
39. ____________ ________ Step mast and rigging.
40. ____________ ________ Check all rigging for length.
41. ____________ ________ Check all clevis and cotter pins for security. Be
sure the locking nuts on the turnbuckles are
secure. Tape all potential chafe points.
42. ____________ ________ Tune rigging to proper tensions.
43. ____________ ________ Attach boom, sheets, blocks, oars, reefing lines,
topping lifts, etc.
44. ____________ ________ Wire bow and deck lights.
MISCELLANEOUS CHECKLIST
45. ____________ ________ Fill water tank(s) and check operation of all
pumps and drains.
46. ____________ ________ Fill alcohol tank. Check for leaks and test
operation of stove.
47. ____________ ________ Water test ports and hatches.
48. ____________ ________ Recheck all through-hulls, valves, seacocks,
host clamps, hoses, and stuffing box.
WHITE-Return to Intrepid Yachts; YELLOW-Owner’s Copy; PINK-Dealer’s Copy
DEALER’S COMMISSIONING CHECKLIST – PAGE 5
- 12

Related product manuals