EasyManua.ls Logo

Ironton 60729 - Before Each Use; Inspection and Preparation; Key Safety Rules for Operation

Ironton 60729
32 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Page 9 of 32
Nuts: M6
Installation Steps
1. Ensure the handle mounting hole fits the base of the mounting holes.
2. Insert the bolt and screw into the nut by hand.
Tighten the nut with an S10 open-end wrench and then tighten the bolt with an S8 open-end wrench.
Before Each Use
Step One: Inspect & Repair
If the pump has been previously used, it must be prepared BEFORE EACH SUBSEQUENT USE.

Related product manuals