SERVICE MANUAL
E-34
D.8.1 Disassembly
1. Remove PTO hood (27) from cover (24).
2. Remove screws (25) from cover (24).
3. Remove cover (24) from gear box.
4. Assemble cover (24) on the vice.
5. Remove seal ring (26) from cover (24).
Note: destructive operation for seal ring.
6. Remove bearing (23) from cover (24).
7. Extract PTO shaft (12).
8. Remove bearing (13) from shaft (12).
9. Remove pin (2).
10. Remove lever (9).
11. Remove pin (5).
12. Remove PTO control fork (7) after raising PTO control lever (1).
13. Remove ball (3) and spring (4) from fork (7).
14. Extract PTO control lever (1).
15. Remove seal ring (8).
Note: destructive operation for seal ring.
16. Remove PTO control pin (6).
17. Extract spacer (22) and washer (21).
18. Remove gear (20).
19. Remove PTO output shaft assy (A), made of PTO sleeve (19), PTO output shaft (18), gear (17) and washer (16).
20. Remove bearings (11) and (15) and supports (10) and (14) with prescribed tool.
ITL