EasyManua.ls Logo

ITV IQ 50 - 5. OPERATION; 5.1. Preliminary Checks and Start-up

ITV IQ 50
44 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
ICE QUEEN
TECHNICAL SERVICE MANUAL
29
5. OPERATION
5.1.
Preliminary Checks
a)
Is machine levelled?
b)
Are voltage and frequency of mains supply the same as indicated on rating plate?
c)
Is drainage system working properly?
d)
Is air circulation and room temperature adequate? (Air-cooled models)
AMBIENT TEMPERATURE WATER TEMPERATURE
MAXIMUM
4C
35°C
MINIMUM
C
C
e)
Is water pressure adequate?
MAXIMUM 0.7 Kg/cm2
MINIMUM 6 Kg/cm2
ATENTION: Check that voltage and mains frequency is the same as in the rating plate.
5.2.
Starting up
Once preliminary check has been completed (ventilation, connections, temperature, etc.),
proceed as follows:
1.
Remove top cover of unit
2.
Open faucet, make sure there are no leaks and check that water level is adequate.
4.
Set switch to OFF position.
5.
Connect unit.